IBM Infoprint 1130/1140
SD=Finisher Stapler access door
3. Pass and Media Sensors
Pass and Media
P=OP M=OP
P=Finisher Pass Thru Sensor
M=Finisher Medium Sensor
4. Bin Level Sensor
Bin Level
EM=OP NF=OP F=OP
EM=Finisher Bin Empty Sensor
NF=Finisher Bin Near Full Sensor
F=Finisher Bin Full Sensor
5. Once the screen is displayed for the test you have selected,
manually actuate the sensor you want to test. When the sensor
is closed CL displays, and when the sensor is open OP
displays.
6. Select Return or Stop to exit the test.
5-Bin Mailbox Diverter Test
Note: This test checks the operation of each mailbox output
diverter. Also, if more than one 5-bin mailbox option is installed, the
test checks all of the diverters installed on the printer.
When the test is selected from the diagnostic menu, the following is
displayed:
Diverter Test Running
This is a single test. The test terminates upon completion.
Registration
The Video Frequency Test runs automatically when Registration is
selected from the menu.
3-28
Service Manual