hit counter script

Restart The Application At The Remote Site; Prepare To Switch Back To The Local Site - IBM System storage DS6000 Series Redbook

Copy services with ibm system z
Hide thumbs Also See for System storage DS6000 Series:
Table of Contents

Advertisement

23.7.7 Restart the application at the remote site

At this stage you may restart the application at the remote site and work with the consistent
set of B volumes; see Figure 23-15.
Primary
Primary
Primary
PENDING
Local site
Figure 23-15 Restart applications at remote site
Note the primary suspended state of the B volumes, which implies change recording and
indicates the changed tracks on the B volumes.
When the local site is about to become ready to restart the applications again and resume the
operations, you prepare the remote site for the next step.

23.7.8 Prepare to switch back to the local site

Primary
A
Primary
Secondary
PENDING
Local site
Figure 23-16 Failback operation from B to A in preparation for returning to local site
The local site is back and operative again. We assume that the local site did not lose the data
at the time when the swap to the remote site was done. It is then possible to resynchronize
the changed data from B to A before restarting the application at the local site. This is
accomplished doing a Failback operation (Copy Services Failback function) from B to A; see
Figure 23-16.
292
IBM System Storage DS6000 Series: Copy Services with IBM System z
A
A
Primary
Primary
A
A
A
Primary
Primary
Global Copy
Host
Restart applications
Global Copy
Host
Failback B to A
Resync from B to A
A
A
Primary
Primary
Primary
B
Primary
A
A
Primary
Primary
Primary
Primary
C
SUSPENDED
Primary
Tertiary
Remote site
A
A
Primary
Primary
Primary
B
Primary
A
A
Primary
Primary
Primary
Primary
C
PENDING
Primary
Tertiary
Remote site

Advertisement

Table of Contents
loading

Table of Contents