Installing the Display on Top of the 29U Rack

1. ____ On the top of the 29U rack, loosen and remove the six screws A (see
2. ____ Remove the top cover B .
Figure 1-28. Removing of the Top Cover
3. ____ Unpack the display and install it on the top of the 29U rack using the
Figure 1-28).
C
B
following steps:
CAUTION
Be careful, the weight of the display is about 15 kg (33 lb).
a. ____ On the top of the 29U rack install the safety retainers D (PN
02N1503) with screws F (PN 1621601) and star washers E (PN
1622336), see Figure 1-29 on page 1-24.
Installing the NAS and Its Modem
A
Chapter 1. Installing and Configuring the NAS and Its Modem
1-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents