hit counter script

Installing The Nas In A 29U Rack; Keyboard Installation In 29U Rack - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

Installing the NAS in a 29U Rack

1. ____ Open the service drawer A , and install the mouse plate B as shown in
Figure 1-21. Keyboard Installation in 29U Rack
2. ____ Unpack the keyboard and the mouse, and install them on the drawer.
3. ____ Route the mouse and keyboard cables under the upper plate of the
4. ____ If you have to install the NAS:
Figure 1-21.
B
drawer.
v Without the earthquake feature, go to "NAS Installation into a 29U Rack
(Standard)" on page 1-18.
v With the earthquake feature, go to "NAS Installation into a 29U Rack
(Earthquake Feature)" on page 1-19.
Installing the NAS and Its Modem
A
Chapter 1. Installing and Configuring the NAS and Its Modem
1-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents