hit counter script

Nas And Upper Plate Installation - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

Figure 5-10. NAS and Upper Plate Installation
6. From the rear of the rack, push the NAS against the previously installed
retainer. Install two retainers J under the upper plate G in order to maintain
the NAS. Secure them using screws H .
7. Install the brackets for the display (see Figure 1-9 on page 1-8 for bracket
location).
8. Slide the display into the rack and secure it with screws B (see Figure 5-11
on page 5-12).
Chapter 5. Nways Switch Administration Station FRU and Display Exchange Procedures
5-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents