hit counter script

Display Removal On Top Of 29U Rack; Removing Of The Top Cover - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

Display Removal on Top of 29U Rack

1. On the top of the 29U rack, loose and remove the six screws A (see
2. Remove the top cover B .
Figure 6-4. Removing of the Top Cover
3. Pull the signal and power display cables through the top opening.
4. Loose and remove the screws F that maintain the safety retainers D (see
Figure 6-4).
C
B
Figure 6-5 on page 6-4).
A
Chapter 6. Display Exchange
6-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents