hit counter script

Upper And Lower Cable-Management Arms - IBM Storwize V7000 Gen2+ Quick Installation Manual

Table of Contents

Advertisement

Figure 53. Upper and lower cable-management arms
As Figure 54 shows, the support rail connectors of each CMA assembly are
installed on the rail hooks at the end of the support rails.
Figure 54. Upper and lower cable-management arms
Procedure
1. Remove the loop straps from the upper and lower CMA assemblies. The straps
Installing the upper CMA assembly
Figure 55 on page 62 shows the connectors on the upper CMA assembly.
are used only for shipping.
Chapter 2. Installing the system hardware
61

Advertisement

Table of Contents
loading

Table of Contents