hit counter script

Power Off/ Shutdown - GE LOGIQ e R4 Series Basic Service Manual

Table of Contents

Advertisement

GE
Direction 5370626-100, Revision 16
3-5-1-2
Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3-5-2

Power Off/ Shutdown

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1
Back-end Processor Power Down
To power down the system:
1.) Press the Power On/Off switch at the front of the system once.
2.) The System-Exit window is displayed.
3.) Using the Trackball or Select key, select Shutdown.
4.) The shutdown process takes a few seconds and is complete when the power status LED is turned
off.
5.) Disconnect the probes.Clean or disinfect all probes as necessary. Store them in their shipping
cases to avoid damage.
6.) Close LCD cover.
3-10
LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Power On/Off switch
Figure 3-6 Power On/Off Switch
Figure 3-7 System Exit Window
Section 3-5 - Completing the Installation

Advertisement

Table of Contents
loading

Table of Contents