GE
Direction 5370626-100, Revision 16
Section 3-2
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
1.) Cut the four PLASTIC BANDs.
2.) Cut the adhesive tape and open top covers of paper carton.
3-4
LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Adhesive tape
Plastic Bands
Figure 3-1 Open top covers of paper carton.
Section 3-2 - Receiving and Unpacking the Equipment
1
2