hit counter script

Physical Inspection - GE LOGIQ e R4 Series Basic Service Manual

Table of Contents

Advertisement

GE
Direction 5370626-100, Revision 18
10-5-5

Physical Inspection

Table 10-9
Step
1
2
Scratches & Dents Inspect the console for dents, scratches or cracks.
3
4
5
6
7
Op Panel Lights
10-8
Physical Checks
Item
Verify that all system labeling is present and in readable condition. Refer to User Manual,...... for
Labeling
details.
Control Panel
Inspect keyboard and control panel. Note any damaged or missing items.
Cables &
Check all internal cable harnesses and connectors for wear and secure connector seating. Pay
Connectors
special attention to footswitch assembly and probe strain or bend reliefs.
Shielding &
Check to ensure that all EMI shielding, internal covers, air flow panels and screws are in place.
Covers
Missing covers and hardware could cause EMI/RFI problems while scanning.
External I/O
Check all connectors for damage.
Check for proper operation of all operator panel and Freeze Key light.
Section 10-5 - System Maintenance
LOGIQ e/LOGIQ e Vet/LOGIQ i/Vivid e Basic Service Manual
Description

Advertisement

Table of Contents
loading

Table of Contents