How to Test the Different Links
The purpose of this procedure is to establish and validate the link between the 2220
and the servers:
v Network Management Station
v Change Control Server
When the Nways Switch administration station is powered on and booted:
1. Click on the Nways Switch installation icon.
2. In the Nways Switch installation window, click on the PM Ping icon.
3. In the PMPING window, click on the Actions option on the menu bar, then on
4. A new PMPING window appears, showing the links tested and the result of the
Note: The command is sent to the servers that have been defined in the
The information displayed provides:
v The TCP/IP address
v The server name
v The response time
the Start option.
test.
configuration file and imported into the configuration data base.
Chapter 3. Nways Switch Administration Station Diagnostics
3-7