hit counter script

Nas Installation Into A 29U Rack (Earthquake Feature) - IBM 300 Service Manual

Nways switch administration station
Hide thumbs Also See for 300:
Table of Contents

Advertisement

NAS Installation into a 29U Rack (Earthquake Feature)

1. ____ Install the captive nuts on the rack for installing the NAS. See Figure 1-23
Front View
Captive Nuts
Locations
Figure 1-23. Captive Nut Positioning for the NAS with Earthquake Feature in 29U Rack
Figure 1-24. Captive Nut Installation
for the front and rear rack location, and Figure 1-24 for captive nut installation.
29
25
Z
2
Z
1
Installing the NAS and Its Modem
Rear View
Captive Nuts
Locations
3
Z
Chapter 1. Installing and Configuring the NAS and Its Modem
1-19

Advertisement

Table of Contents
loading

This manual is also suitable for:

5005012220 nways 3002220 nways 5002220 nways 5016563

Table of Contents