Figure 6-7. Display Installation on Top of 29U Rack
3. Route the display power and signal cables through the top opening.
4. Reinstall the top cover B (see Figure 6-4 on page 6-3). Be sure that the signal
5. At the rear of the Nways Switch administration station, connect the display
6-6
2220 Setup and Service Guide
D
c. Put the display in place (near the front of the machine).
d. Once the display is in place, secure it by tightening the screws F .
and power display cables are correctly routed in the top aperture C . Secure
the top cover with the screws A previously removed.
signal cable L (see Figure 6-8 on page 6-7).