Installing
3.4 Installing Control Unit
3.4
Installing Control Unit
3.4.1
Snapping the Control Unit onto the Power Module
Installing the Control Unit on an IP20 Power Module
To gain access to the terminal strips, open the top and bottom front doors to the right. The
terminal strips use spring-loaded terminals.
42
Plugging on the CU
Removing the CU
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB