hit counter script

Regulatory Requirements For Exit Signs - HP POD 20c Maintenance And Service Manual

Table of Contents

Advertisement

The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an
existing facility, and are not suitable as "service entrance" for connection to the utility.
The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment,
in restricted access locations, with field wiring terminals provided for permanent supply connections.
The HP POD 20c meets the following ratings.
Feature
Category
Protection
Class
Ambient temperature
Relative humidity
As part of the overall certification, relevant sections of the International Building Code have been
applied as part of the design and evaluation. The current design supports wind loads up to 90 mph.

Regulatory requirements for EXIT signs

Manufacturers of tritium EXIT signs are "specific licensees," meaning they are licensed by the NRC or an
Agreement State. The signs are considered "generally licensed devices," because they are inherently safe
enough to be handled or used by anyone with no radiation training or experience. Although purchasers –
known as "general licensees" – do not need authorization from the NRC or a state regulatory agency to
possess the signs, they are subject to certain regulatory requirements regarding handling, transfer or disposal
of the signs. For more information, see the NRC website
(http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/fs-tritium.html#_edn2). They are also subject
to NRC or Agreement State inspection and enforcement action (including fines) for violating those
requirements. Manufacturers must inform purchasers of the EXIT signs of the regulatory requirements for
generally licensed devices. The general licensee is required to designate an individual responsible for
complying with the regulatory requirements.
Under NRC regulations, a general licensee using tritium EXIT signs:
must NOT remove the labeling or radioactive symbol, or abandon a sign;
must properly dispose of an unused sign (see below);
must report to the NRC or the appropriate Agreement State any lost, stolen or broken signs;
must inform the NRC or an Agreement State of a name change, change of address or replacement of
a general licensee's designated representative;
must NOT give away or sell the sign to another individual, company or institution unless the device is
to remain in use at its original intended location; in such a case, the transferor is to notify the recipient
of the regulatory requirements and must notify the NRC or Agreement State of the transfer within 30
days.
Tritium EXIT signs must NOT be disposed of as normal trash. To dispose of a sign properly, a general licensee
must transfer the sign to a specific licensee. This would typically be a manufacturer, distributor, licensed
radioactive waste broker, or a licensed low-level radioactive waste disposal facility. These facilities may
charge a fee for this service.
Within 30 days of disposing of a sign, the general licensee is required to file a report to the NRC or
Agreement State that includes:
Specification
Rated Overvoltage Category III
Surge protection device
Class1
2°C to 54°C (35.6°F to 129.2°F)
0% to 100% humidity
Regulatory information 74

Advertisement

Table of Contents
loading

Table of Contents