hit counter script

Humidifier (If Installed) - HP POD 20c Maintenance And Service Manual

Table of Contents

Advertisement

CAUTION:
water cooling system from the site. Contact HP immediately to initiate a field service call. Do not
attempt to repair the chilled water cooling system. Attempting to self-repair the chilled water
cooling system during the warranty or service contract period shifts all liability to you.
IMPORTANT:
Non-isolable leak detection
A non-isolable leak is a leak from the main supply line or the return header.
To repair a non-isolable leak:
Power down all IT equipment.
1.
Re-direct the leaking water away from the IT equipment.
2.
Repair the leak or contact HP if you are still within your service contract.
3.
Isolable leak detection
An isolable leak is any type of leak that does not occur from the main supply line or the return header.
To repair an isolable leak:
Inspect the zone indicated on the ECS Status Overview screen. You might need to inspect each zone
1.
condensate drain pan to determine the exact location of the leak.
Power down the IT equipment in the zone where the leak is located.
2.
Determine the affected heat exchanger.
3.
Close and danger tag the supply and return valves to the affected heat exchanger.
4.
If the heat affected exchanger cannot be identified, close all the heat exchanger supply and return
valves in the affected zone and open one supply valve at a time to determine the location of the leak.
Repair the leak or contact HP if you are still within your service contract.
5.

Humidifier (if installed)

Component to be inspected
Humidifier
Humidifier drains
If a serious leak develops, shut down the POD immediately and isolate the chilled
Power down the POD after a leak is detected.
Task
Inspect for water leaks, verify
that no sparks form between
the electrodes during
operation
Inspect the general operation
of the cylinder.
Verify the following:
Drains are in working order
There is an air gap at the
funnel/drain entry into the site
system
Drain discharge is not getting
water on external equipment
or grounding system
Frequency
Capable Party
Bi-weekly, if
Qualified personnel
staffed
Quarterly, if
not staffed
Qualified personnel
Quarterly
Periodic maintenance 63

Advertisement

Table of Contents
loading

Table of Contents