hit counter script

Operation Using The Operator Panel - Siemens SIRIUS 3RB24 Manual

Protection devices electronic overload relay
Hide thumbs Also See for SIRIUS 3RB24:
Table of Contents

Advertisement

10.6

Operation using the operator panel

Operation using the operator panel
The solid-state overload relay for IO-Link is controlled in manual mode with the operator panel.
The device statuses are also scanned.
Connecting
The operator panel is connected to the interface on the front of the solid-state overload relay for
IO-Link using the 10‑core connecting cable for the operator panel.
Figure 10-7
NOTICE
To avoid faults in the overload relay and a defect on the operator panel, connect or disconnect
the operator panel only when the power to the evaluation unit is turned off.
Operator controls and display elements of the operator panel
The representation below explains the operator controls and display elements of the operator
panel.
Note
Enable signals from the enabling module
The operator controls of the operator panel only function if the enabling module is plugged in.
SIRIUS 3RB24 electronic overload relay for IO-Link
Equipment Manual, 07/2022, NEB969165602000/RS-AA/003
Connecting the operator panel to the solid-state overload relay for IO-Link
10.6 Operation using the operator panel
Operation
95

Advertisement

Table of Contents
loading

Table of Contents