8.3
Snapping onto/off DIN rail (snap-on mounting)
The illustration below shows how to snap the devices onto/off a DIN rail:
Step
1
SIRIUS 3RB24 electronic overload relay for IO-Link
Equipment Manual, 07/2022, NEB969165602000/RS-AA/003
Instruction
Place the evaluation module on the upper
edge of the rail and press it down until it
snaps onto the lower edge of the rail.
To remove, push the evaluation module
against the pressure of the securing spring
and swing it out.
8.3 Snapping onto/off DIN rail (snap-on mounting)
Image
Mounting/removal
65