8.7
Installing an operator panel
The operator panel is designed for use in the front panels of motor control centers, for example,
or in control cabinet doors.
For information on connecting the operator panel, please refer to "Operation using the operator
panel (Page 95)".
Installing
Step
1
2
3
4
NOTICE
In order to guarantee the IP54 tightness and correct functionality of the operator panel, ensure
that the tightening torque of the screws selected is not excessive when tightening the enclosed
screws.
SIRIUS 3RB24 electronic overload relay for IO-Link
Equipment Manual, 07/2022, NEB969165602000/RS-AA/003
Instruction
Make a cutout in the front panel, for exam‐
ple, or in the control cabinet door.
Insert the operator panel in the cutout.
Snap the four securing brackets onto the
operator panel. Screw the securing brackets
with one screw each (maximum tightening
torque 4 x 0.15 + 0.05 Nm).
Lock the operator panel in position by tight‐
ening the four screws on the securing brack‐
ets.
8.7 Installing an operator panel
Image
+0.5
90
Mounting/removal
4x
69