5. Attach cables and power up the Power Management Module.
6. Configure and set up the Power Management Module

Configure and setup after device replacement

1. Configure the new Power Management Module with the same IP address of
2. Verify that the firmware level is correct.
3. IBM Customer Support personnel will update the firmware if necessary.
4. For firmware versions prior to 2.2, an SNMP patch must be applied to maintain

Installation of power bricks for RSAs on tray

1. Place the power bricks on the tray, as shown in the figure below. Use the
a. Plug the Power Management Module power cable into the PDU
b. Plug the power cables from the power bricks on the tray into the Power
Management Module
c. Power up the port servers
d. Plug in the remote power cables to the RSA cards
e. Verify that all LEDs indicate that power is applied
If power is not applied, use the telnet command to enable power to the
Power Management Module. Then enable the devices through the menu
system. The default settings are for outlets to be on when power is applied.
the Power Management Module you removed
security. The SNMP patch for the AP9212 is available for download at:
http://apcc.com/tools/download/
positioning tabs to place the power bricks. Make sure the power bricks are
positioned so that the label is facing up, as shown in Figure 24 on page 118.
Chapter 20. Power Management Module replacement and configuration