3. Attach cables and then power up the Cisco 10/100 Switch.
4. Configure and setup the Cisco 10/100 Switch. Refer to "Configuration and

Replacement of the 48-port switch

To replace the Cisco 48-port 10/100 Switch, you must remove the rails from the
cabinet.

Remove the rails from the cabinet

To remove the tray from the cabinet, do the following:
1. Remove the mounting screws from the front vertical cabinet rails and remove
2. Remove the mounting screws from the rear vertical cabinet rails.
3. Slide the rails out the rear of the cabinet.

Remove the Cisco 48-Port 10/100 Switch from the rails

Unscrew the Cisco 10/100 Switch from the rails. There are four holes on each side
of the devices.

Install the Cisco 48-Port 10/100 Switch and rails

1. Mount the switch rails to the 48-Port Cisco 10/100 Switch. Mount the rails so
96
Installation and Service
d. At the front of the cabinet, place the long cover bracket on the outside of
the cabinet vertical rails and insert the mounting screws, as shown in
Figure 13 on page 95. Insert four screws on each side.
e. Tighten the mounting screws in the cabinet vertical rails with a Phillips #3
screwdriver.
setup after device replacement" on page 99.
the cover bracket.
the Cable Management Tab is on the left rail, as shown in the figure below. Use
four screws on each side. Use the set of two large holes at the front of the rail
and the set of two large holes that are the second set from the back of the rail.