Installation and Commissioning
7SS60 Manual
E50417-G1176-C132-A1
This section is primarily for personnel who are experienced in installing, testing, and
commissioning protective and control systems, and are familiar with applicable safety
rules, safety regulations, and the operation of the power system. Some modifications
of the hardware to the station data may be necessary. For primary tests, the switch-
gear must be isolated to perform switching operations.
7.1
Installation and connection
7.2
Commissioning
7
7-2
7-5
7-1