hit counter script

Installation Warnings - GE LOGIQ C3 Premium Basic Service Manual

Hide thumbs Also See for LOGIQ C3 Premium:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5273008-100, R
IRECTION
3-2-2

Installation Warnings

1.) Since the LOGIQ C3/C5 Premium weighs approximately 75 kg without options, preferably two
people should unpack it. Two people are also preferable for installing any additional bulky items.
2.) There are no operator serviceable components. To prevent shock, do not remove any covers or
panels. Should problems or malfunctions occur, unplug the power cord. Only qualified service
personnel should carry out servicing and troubleshooting.
NOTE:
For information regarding packing labels, refer to LABELS ON PACKAGE.
3.) After being transported, the unit may be very cold or hot. If this is the case, allow the unit to
acclimate before you turn it on. It requires one hour for each 2.5°C increment it's temperature is
below 10°C or above 30°C.
Equipment damage possibility. Turning the system on without acclimation after arriving at site
CAUTION
may cause the system to be damaged.
Table 3-3
°C
60
°F
140 131 122 113 104
8
hrs
8
EVISION
Acclimation Time
55
50
45
40
35
30
95
86
6
4
2
0
0
0
Chapter 3 System Setup
25
20
15
10
5
0
77
68
59
50
41
32
0
0
0
0
2
4
VIVID FIVE
B
S
ASIC
ERVICE
-5
-10
-15
-20
-25
-30
23
14
5
-4
-13
-22
6
8
10
12
14
16
M
ANUAL
-35
-40
-31
-40
18
20
3 - 3

Advertisement

Table of Contents
loading

Table of Contents