Commissioning
5.5 Quick commissioning with a PC
5.5
Quick commissioning with a PC
The screen forms that are shown in this manual show generally valid examples. The number
of setting options available in screen forms depends on the particular inverter type.
Requirements
To be able to perform quick commissioning using a PC, you need to do the following:
1. Creating a project
2. Integrating the inverter into the project
3. Go online and start the quick commissioning
5.5.1
Creating a project
Creating a new project
Procedure
To create a new project, proceed as follows:
1. Start the commissioning software STARTER or Startdrive.
2. In the menu, select "Project" → "New...".
3. Specify a name of your choice for the project.
You have created a new project.
174
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE