IBM BladeCenter Power Supply Modules
This option contains the warranty information, installation instructions, and the
following components for your IBM
Attention:
modules must always be present in power bays 1 and 2. When any blade server or
option is in blade bay 7 through 14, power modules must be present in power bays
1 and 2, and power modules must be present in power bays 3 and 4.
If a power module fails or an ac power failure occurs, BladeCenter units configured
for redundant power operation will operate in a nonredundant mode, and the blower
modules will run at full speed. You must replace the failing power module or restore
ac power as soon as possible to regain redundant power operation and to reset the
blower modules to their normal operating speed.
Installation guidelines
Attention:
the latest level of management-module firmware. If two management modules are
installed in the BladeCenter unit, both management modules must be upgraded to
the same level of firmware. Go to the IBM Support Web site at
http://www.ibm.com/pc/support/ and obtain the latest firmware.
Before you begin to install power supply modules (also called power modules) in
your BladeCenter unit, read the following information:
v You do not need to disconnect the BladeCenter unit from power to install or
© Copyright IBM Corp. 2004
Nonredundant power is not supported in BladeCenter products. Power
Release lever
If you are installing or replacing power modules, you must upgrade to
replace any of the hot-swap modules on the rear of the BladeCenter unit.
®
™
BladeCenter
Power supply
modules
Power cords
Power Supply Modules.
1