hit counter script

Preparing The System For Operation - IBM 9009-22A Manual

Drive backplanes
Hide thumbs Also See for 9009-22A:
Table of Contents

Advertisement

Figure 58. Replacing the front drives and fillers
7. Replace the air baffles. For instructions, see Replacing the air baffle (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_922_airbafflereplace.htm).
Preparing the 9009-22G or 9223-22S system for operation after removing and replacing
the NVMe drive backplane
To prepare the system for operation after removing and replacing the NVMe drive backplane, complete
the steps in this procedure.
Procedure
1. Slide the service access cover (A) onto the system unit.
2. Close the release latch (B) by pushing it in the direction shown.
Drive backplanes for the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S 63

Advertisement

Table of Contents
loading

This manual is also suitable for:

9008-22l5105-22e9009-22g9223-22h9223-22s

Table of Contents