Page 1
Power Systems NVMe M.2 carrier cards and flash modules for the 5105-22E, 9008-22L, 9009-22A, or 9223-22H...
Page 2
Note Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on page 53, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. ®...
Permanently removing an NVMe M.2 carrier card and flash module..........38 Preparing the system for operation..................... 46 Related procedures............................50 Checking the amount of remaining life in NVMe devices..............50 Removing an operational NVMe device from an IBM i logical partition..........51 Notices........................53 Privacy policy considerations ........................54 Trademarks..............................54 Electronic emission notices........................54...
Das Produkt ist nicht für den Einsatz an Bildschirmarbeitsplätzen im Sinne § 2 der Bildschirmarbeitsverordnung geeignet. Laser safety information IBM servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs. Laser compliance IBM servers may be installed inside or outside of an IT equipment rack.
Page 6
• When possible, use one hand only to connect or disconnect signal cables. • Never turn on any equipment when there is evidence of fire, water, or structural damage. • Do not attempt to switch on power to the machine until all possible unsafe conditions are corrected. •...
Page 7
– For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the power to the system unit(s), or disconnect the customer’s DC power source, when directed to disconnect power during servicing. • Connect all devices installed in a rack cabinet to power devices installed in the same rack cabinet.
Page 8
– Ensure that there are little-to-no empty U-levels between devices installed in the rack cabinet below the 32U level, unless the received configuration specifically allowed it. • If the rack cabinet you are relocating is part of a suite of rack cabinets, detach the rack cabinet from the suite.
Page 9
• Do not put any load on the slide-rail mounted equipment mounted in the installation position. • Do not leave the slide-rail mounted equipment in the installation position. (L002) (L003) Safety notices ix...
Page 10
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) (L008) CAUTION: Hazardous moving parts nearby.
Page 11
Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call.
Page 12
Freewheeling will cause uneven cable wrapping around winch drum, damage cable, and may cause serious injury. • This TOOL must be maintained correctly for IBM Service personnel to use it. IBM shall inspect condition and verify maintenance history before operation. Personnel reserve the right not to use TOOL if inadequate.
Page 13
The dc-powered system employs an isolated DC return (DC-I) design. The DC battery return terminal shall not be connected to the chassis or frame ground. The dc-powered system is intended to be installed in a common bonding network (CBN) as described in GR-1089-CORE.
Page 14
xiv Power Systems: NVMe M.2 carrier cards and flash modules...
Installing an NVMe M.2 carrier card and flash module in the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system Find information about installing an NVMe M.2 carrier card and flash module in the 5105-22E, IBM Power System L922 (9008-22L), IBM Power System S922 (9009-22A), or IBM Power System H922 (9223-22H) server.
Page 16
Figure 1. Removing the power cords (L003) 2 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 17
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) NVMe M.2 carrier cards and flash modules 3...
Page 18
4. Open the side latches (A) and pull the latches to slide the system unit fully into the service position, until the slides click and hold the system unit securely. Ensure that the screws inside the latches are not secured to the rack. Remove the hook-and-loop fasteners that secure the cable management arms.
Page 19
Figure 2. Releasing the side latches 5. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed, and if applicable, until the service access cover is replaced. Attention: •...
Attention: Operating the system without the service access cover on for more than 10 minutes when the system power is turned on might damage the system components. Figure 3. Removing the service access cover Installing an NVMe M.2 carrier card and flash module in the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system To install an NVMe M.2 carrier card and flash module in the system, complete the steps in this procedure.
Page 21
Figure 4. Removing the air baffle 3. Slide one of the new NVMe M.2 flash modules into the NVMe M.2 carrier card socket. See Figure 5 on page 8. Note: There is no plugging sequence when installing two NVMe M.2 flash modules. NVMe M.2 carrier cards and flash modules 7...
Page 22
Figure 5. Installing an NVMe M.2 flash module 4. Using a Phillips screwdriver, secure the flash module onto the NVMe M.2 carrier card as shown in the following figure. 8 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 23
Figure 6. Securing the NVMe M.2 flash module onto the carrier card 5. Repeat steps “3” on page 7 and “4” on page 8 for the other NVMe M.2 flash module, if needed. 6. Close the black cover on the NVMe M.2 carrier card. NVMe M.2 carrier cards and flash modules 9...
Page 24
Figure 7. Closing the NVMe M.2 carrier card's black cover 7. Lower the NVMe M.2 carrier card down into the slot. 8. Push in and twist the screws (A) clockwise to fully seat the NVMe M.2 carrier card as shown in the following figure.
Page 25
Figure 8. Seating the NVMe M.2 carrier card 9. Replace each air baffle (A) straight down into the chassis. See Figure 9 on page 12. When an air baffle is upside-down, hold the detachable drive cover to prevent it from coming loose. NVMe M.2 carrier cards and flash modules 11...
Figure 9. Replacing the air baffle Preparing the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system for operation after installing an NVMe M.2 carrier card and flash module To prepare the system for operation after installing an NVMe M.2 carrier card and flash module, complete the steps in this procedure.
Page 27
Figure 10. Installing the service access cover 4. Push the system unit (B) back into the rack until both release latches of the system unit lock into position. Secure the cable management arm with hook-and-loop fasteners around the back side of the cable management arm, but not around the cables.
Page 28
Figure 11. Connecting the power cords 6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. Verify the installed part. • If you replaced the part because of a service action, verify the installed part. For instructions, see Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ect/pxect_verifyrepair.htm).
You might be charged a fee by the service provider for this service. If your system is managed by the Hardware Management Console (HMC), use the HMC to repair a part in the system. For instructions, see Repairing a part by using the HMC (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_hmc_repair.htm).
Page 30
Figure 12. Removing the power cords (L003) 16 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 31
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) NVMe M.2 carrier cards and flash modules 17...
Page 32
4. Open the side latches (A) and pull the latches to slide the system unit fully into the service position, until the slides click and hold the system unit securely. Ensure that the screws inside the latches are not secured to the rack. Remove the hook-and-loop fasteners that secure the cable management arms.
Page 33
Figure 13. Releasing the side latches 5. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed, and if applicable, until the service access cover is replaced. Attention: •...
Attention: Operating the system without the service access cover on for more than 10 minutes when the system power is turned on might damage the system components. Figure 14. Removing the service access cover Removing an NVMe M.2 carrier card and flash module from the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system To remove an NVMe M.2 carrier card and flash module from the system, complete the steps in this procedure.
Page 35
Figure 15. Removing the air baffle 3. Twist the screws (A) counterclockwise to release the NVMe M.2 carrier card. 4. Lift the NVMe M.2 carrier card out of the slot as shown in Figure 16 on page 22. NVMe M.2 carrier cards and flash modules 21...
Page 36
Figure 16. Removing the NVMe M.2 carrier card 5. Place the NVMe M.2 carrier card on an appropriate ESD surface. 6. To remove the NVMe M.2 carrier card flash module, complete the following steps: a) Lift the NVMe M.2 carrier card's black cover by pulling up near the pull tab as shown in the following figure.
Page 37
Figure 17. Lifting the NVMe M.2 carrier card cover b) Using a Phillips screwdriver, unscrew the screw on the NVMe M.2 flash module as shown in the following figure. NVMe M.2 carrier cards and flash modules 23...
Page 38
Figure 18. Unscrewing the NVMe M.2 carrier card flash module c) Remove the flash module by lifting and rotating it as shown in the following figure. 24 Power Systems: NVMe M.2 carrier cards and flash modules...
Figure 19. Removing the NVMe M.2 carrier card flash module d) Repeat these steps for the other NVMe M.2. flash module, if needed. Replacing an NVMe M.2 carrier card and flash module in the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system To replace an NVMe M.2 carrier card and flash module in the system, complete the steps in this procedure.
Page 40
Figure 20. Installing an NVMe M.2 flash module 3. Using a Phillips screwdriver, secure the flash module onto the NVMe M.2 carrier card as shown in the following figure. 26 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 41
Figure 21. Securing the NVMe M.2 flash module onto the carrier card 4. Repeat steps “2” on page 25 and “3” on page 26 for the other NVMe M.2 flash module, if needed. 5. Close the black cover on the NVMe M.2 carrier card. NVMe M.2 carrier cards and flash modules 27...
Page 42
Figure 22. Closing the NVMe M.2 carrier card's black cover 6. Lower the NVMe M.2 carrier card down into the slot. 7. Push in and twist the screws (A) clockwise to fully seat the NVMe M.2 carrier card as shown in the following figure.
Page 43
Figure 23. Seating the NVMe M.2 carrier card 8. Replace each air baffle (A) straight down into the chassis. See Figure 24 on page 30. When an air baffle is upside-down, hold the detachable drive cover to prevent it from coming loose. NVMe M.2 carrier cards and flash modules 29...
Figure 24. Replacing the air baffle Preparing the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system for operation after removing and replacing an NVMe M.2 carrier card and flash module To prepare the system for operation after removing and replacing an NVMe M.2 carrier card and flash module, complete the steps in this procedure.
Page 45
Figure 25. Installing the service access cover 4. Push the system unit (B) back into the rack until both release latches of the system unit lock into position. Secure the cable management arm with hook-and-loop fasteners around the back side of the cable management arm, but not around the cables.
Page 46
Figure 26. Connecting the power cords 6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. Verify the installed part. • If you replaced the part because of a service action, verify the installed part. For instructions, see Verifying a repair (www.ibm.com/support/knowledgecenter/POWER9/p9ect/pxect_verifyrepair.htm).
You might be charged a fee by the service provider for this service. If your system is managed by the Hardware Management Console (HMC), use the HMC to install the part in the system. For instructions, see Installing a part by using the HMC (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/hmcinstall.htm).
Page 48
Figure 27. Removing the power cords (L003) 34 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 49
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) NVMe M.2 carrier cards and flash modules 35...
Page 50
4. Open the side latches (A) and pull the latches to slide the system unit fully into the service position, until the slides click and hold the system unit securely. Ensure that the screws inside the latches are not secured to the rack. Remove the hook-and-loop fasteners that secure the cable management arms.
Page 51
Figure 28. Releasing the side latches 5. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is completed, and if applicable, until the service access cover is replaced. Attention: •...
Attention: Operating the system without the service access cover on for more than 10 minutes when the system power is turned on might damage the system components. Figure 29. Removing the service access cover Permanently removing an NVMe M.2 carrier card and flash module from the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system To permanently remove a NVMe M.2 carrier card and flash module from the system, complete the steps in this procedure.
Page 53
Figure 30. Removing the air baffle 3. Twist the screws (A) counterclockwise to release the NVMe M.2 carrier card. 4. Lift the NVMe M.2 carrier card out of the slot as shown in Figure 31 on page 40. NVMe M.2 carrier cards and flash modules 39...
Page 54
Figure 31. Removing the NVMe M.2 carrier card 5. Place the NVMe M.2 carrier card on an appropriate ESD surface. 6. To remove the NVMe M.2 carrier card flash module, complete the following steps: a) Lift the NVMe M.2 carrier card's black cover by pulling up near the pull tab as shown in the following figure.
Page 55
Figure 32. Lifting the NVMe M.2 carrier card cover b) Using a Phillips screwdriver, unscrew the screw on the NVMe M.2 flash module as shown in the following figure. NVMe M.2 carrier cards and flash modules 41...
Page 56
Figure 33. Unscrewing the NVMe M.2 carrier card flash module c) Remove the flash module by lifting and rotating it as shown in the following figure. 42 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 57
Figure 34. Removing the NVMe M.2 carrier card flash module d) Repeat these steps for the other NVMe M.2. flash module, if needed. 7. To ensure proper air flow, you must install a clip-in filler and air divider. a) Align the clip-in filler over the empty SAS slot. b) Rotate the top of the clip-in filler until the bottom hook clips onto the air screen.
Page 58
Figure 35. Installing the clip-in filler c) Lower the air divider into place as shown in the following figure. 44 Power Systems: NVMe M.2 carrier cards and flash modules...
Page 59
Figure 36. Installing the air divider 8. Replace each air baffle (A) straight down into the chassis. See Figure 37 on page 46. When an air baffle is upside-down, hold the detachable drive cover to prevent it from coming loose. NVMe M.2 carrier cards and flash modules 45...
Figure 37. Replacing the air baffle Preparing the 5105-22E, 9008-22L, 9009-22A, or 9223-22H system for operation after permanently removing an NVMe M.2 carrier card and flash module To prepare the system for operation after permanently removing an NVMe M.2 carrier card and flash module, complete the steps in this procedure.
Page 61
Figure 38. Installing the service access cover 4. Push the system unit (B) back into the rack until both release latches of the system unit lock into position. Secure the cable management arm with hook-and-loop fasteners around the back side of the cable management arm, but not around the cables.
Page 62
6. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/ POWER9/p9haj/crustartsys.htm). 7. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/ knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm). 8. To ensure proper air flow, you must install a clip-in filler and air divider.
Page 63
Figure 40. Installing the clip-in filler c) Lower the air divider into place as shown in the following figure. NVMe M.2 carrier cards and flash modules 49...
• Running the AIX command to check the amount of remaining life in NVMe devices (www.ibm.com/ support/knowledgecenter/POWER9/p9hak/pxhak_nvme_remaining_life_aix.htm) • Running the IBM i command to check the amount of remaining life in NVMe devices (www.ibm.com/ support/knowledgecenter/POWER9/p9hak/pxhak_nvme_remaining_life_ibmi.htm) 50 Power Systems: NVMe M.2 carrier cards and flash modules...
For details, see Removing an operational NVMe device from a partition in the IBM i Knowledge Center. Note: To navigate to the page in the IBM i 7.4 Knowledge Center, select Systems management > Disk management > Disk management checklist > Removing an operational NVMe device from a partition.
Page 66
52 Power Systems: NVMe M.2 carrier cards and flash modules...
Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the web at Copyright and trademark information.
Page 69
Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
Page 70
IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 (0) 800 225 5426 email: HalloIBM@de.ibm.com Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55022 / EN 55032 Klasse A. Japan Electronics and Information Technology Industries Association (JEITA) Notice This statement applies to products less than or equal to 20 A per phase.
Page 71
Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment.
Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
Page 73
Tel: +49 (0) 800 225 5426 email: HalloIBM@de.ibm.com Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55032 Klasse B Japan Electronics and Information Technology Industries Association (JEITA) Notice This statement applies to products less than or equal to 20 A per phase.
Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
Page 75
IBM reserves the right to withdraw the permissions granted herein whenever, in its discretion, the use of the publications is detrimental to its interest or, as determined by IBM, the above instructions are not being properly followed. You may not download, export or re-export this information except in full compliance with all applicable laws and regulations, including all United States export laws and regulations.
Page 76
62 Power Systems: NVMe M.2 carrier cards and flash modules...