Step 17
Step 18
Step 19
Update Procedure
The following is necessary to use the Update function:
Step
Step
Step
5-10
3745 All Models & 3746-900: CIG
When the IPL has completed phase 4, the following message is
displayed for each CCU undergoing IPL:
IPL PHASE 4 ENABLED CA xxx...
If other messages appear or the letter U appears anywhere after CA,
refer to the Basic Operations Guide, SA33-0177, for an explanation.
Call the host operator and ask for the control program(s) to be loaded
into your communication controller. Let the IPL continue, no additional
3745 operator action is required.
When the IPL is finished, the following message is displayed once for
each CCU undergoing IPL:
IPL COMPLETE
If other messages appear, refer to the Basic Operations Guide,
SA33-0177, for an explanation.
Otherwise, continue with other integration procedures.
Note: You must do "Saving MOSS from Fixed Disk onto Diskettes" on
page 5-19 when you have finished all other integration procedures.
Up-to-date plugging sheets for the modifications that you are making.
The lines being updated must have been defined at control program generation
time (SYSGEN).
When updating the cable information for an HSS line, the appropriate line(s)
must be deactivated.
The MOSS must be on-line.
1. If MOSS is alone, begin at Step 1.
2. If MOSS is off-line, and you have a dual CCU 3745 begin at Step 7 on
page 5-11.
3. If MOSS is off-line, and you have a single CCU 3745 begin at Step 14 on
page 5-11.
4. If MOSS is on-line, begin at Step 15 on page 5-11.
1
2
If you have a dual CCU controller:
or
or
Otherwise, continue with the next step.
3
or
then
If you are loading the control program from the 3745 fixed disk (using
the MOSS DII function), go to Step 6 on page 5-11.
Otherwise, continue with the next step.
then
or
then