hit counter script

Programming Line Frequency; Programming Analog Out Levels For The Solar Ecg Module - GE Solar 7000 Service Manual

Patient monitor
Table of Contents

Advertisement

Programming Line
Frequency
Programming
Analog Out Levels
for the Solar ECG
Module
6-8
CONFIGURATION: Configuring a Monitor
Use the BOOT LOADER service menu to configure or change the
monitor line frequency to 50 or 60 Hertz. The default is 60 Hz.
1. To activate the BOOT LOADER program, do the following:
Hold down the NBP GO/STOP and ZERO ALL keys on the
front panel. (For the Solar View remote display controller,
hold down the two blank keys.)
Press and release the Trim Knob control.
Keep holding the NBP GO/STOP and ZERO ALL keys (or two
blank keys for the SolarView remote display controller) until
the BOOT LOADER menu appears on the display.
2. Select SERVICE MENU.
3. Under the SET CONFIGURATION menu option, select 50 Hz or 60
Hz line frequency.
The Solar monitor controls the analog out signal (MARKER OUT) used
to trigger a defibrillator the Solar ECG module. Refer to the defibrillator
manufacturer's manual for the required pulse amplitude and duration.
Use the BOOT LOADER service menu to configure or change the
MARKER OUT signal of the DEFIB SYNC connector on a Solar ECG
module.
1. To activate the BOOT LOADER program, doing the following:
Hold down the NBP GO/STOP and ZERO ALL keys on the
front panel. (For the Solar View remote display controller,
hold down the two blank keys.)
Press and release the Trim Knob control.
Keep holding the NBP GO/STOP and ZERO ALL keys (or two
blank keys for the SolarView remote display controller) until
the BOOT LOADER menu appears on the display.
2. Select SERVICE MENU.
3. Under the SET CONFIGURATION menu option, select the desired
levels.
Select 5V or 12V amplitude.
Select 10 ms or 100 ms for pulse duration.
Solar 7000/8000/View Patient Monitor
414993-001
Revision J

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solar 8000Solar solarview

Table of Contents