Servicing and maintenance
6.4 Standard commissioning
6.4
Standard commissioning
Standard commissioning with a valid parameter set
If you have a memory card with a valid parameter set, then you can also perform standard
commissioning for several inverters.
Prerequisites
● Several inverters (Control Units and Power Modules of the same type) must be
● A memory card with a valid parameter set is available.
Procedure for standard commissioning
1. Insert the memory card into the control unit of the first inverter.
2. Switch-on the inverter power supply (the valid parameter set is downloaded into the
3. Wait until the inverter has completely booted (RDY-LED and SF-LED are lit, BOP returns
4. Remove the memory card and acknowledge message F0395 (SF-LED is dark)
5. Proceed with the next inverter
218
commissioned for the same application.
inverter from the memory card)
to the standard display)
CU240S and CU240E Control Units, FW 3.2
Operating Instructions, 03/2009, A5E02440075B AA