hit counter script
Table of Contents

Advertisement

2.3 Installation
Step 4b (Eagle 1000A) - Insert the connector plug inside the bottom of the mast into the
corresponding receptacles.
Step 5 - Verify that all screws are tight and then turn on the power. Verify power indicator is on.
(See Fig 2-7)
Fig. 2-7
- 14 -
M8 Screw
Sensor Wire
Socket
Manual
Stretch
Roller
Transition
Roller

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000b

Table of Contents