hit counter script

Temperature Checkout - IBM xSeries 342 2RX Maintenance Manual

Hardware maintenance manual
Table of Contents

Advertisement

4. Insert the new battery:
5. Reinstall the server cover and connect the cables.
6. Turn the server on.
7. Start the Configuration/Setup Utility program and set configuration

Temperature checkout

Proper cooling of the system is important for proper operation and system
reliability. For a typical xSeries 342 server, you should make sure:
v Each of the drive bays has either a drive or a filler panel installed
v Each of the power supply bays has either a power supply or a filler panel
v The top cover is in place during normal operation
v There is at least 50 mm (2 inches) of ventilated space at the sides of the server
v The top cover is removed for no longer than 30 minutes while the server is
v The processor housing cover covering the processor and memory area is
v A removed hot-swap drive is replaced within two minutes of removal
v Cables for optional adapters are routed according to the instructions provided
v The fans are operating correctly and the air flow is good
v A failed fan is replaced within 48 hours
In addition, ensure that the environmental specifications for the system are met.
See "Features and specifications" on page 3.
a. Tilt the battery so that you can insert it into the socket, under the battery
clip.
b. As you slide it under the battery clip, press the battery down into the
socket.
parameters.
v Set the system date and time.
v Set the power-on password.
v Reconfigure your server.
installed
and 100 mm (4 inches) at the rear of the server
operating
removed for no longer that ten minutes while the server is operating
with the adapters (ensure that cables are not restricting air flow)
21
Diagnostics

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xseries 342 2tgXseries 342 1tgXseries 342 1rx

Table of Contents