hit counter script

Toshiba Portege R100 User Manual page 140

Personal computer
Hide thumbs Also See for Portege R100:
Table of Contents

Advertisement

3 Tests and Diagnostics
3. After specifying of the Serial #A test, the following message will appear:
Mount the work disk(s) on the drive(s),
then press [Enter] key.
[Warning : The contents of the disk(s),
will be destroyed.]
4. This program is executed in the above mentioned ways. To terminate the program,
press Ctrl + Break.
3-50
PORTEGE R100 Maintenance Manual (960-440)
3.21 Running Test

Advertisement

Table of Contents
loading

Table of Contents