hit counter script

Component Test Procedure - LG MS2548GR Service Manual

Hide thumbs Also See for MS2548GR:
Table of Contents

Advertisement

COMPONENT TEST PROCEDURE

CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
Copyright © 2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
TEST PROCEDURE
FILAMENT
WINDING
TERMINAL
SECONDARY
TERMINAL
PRIMARY
TERMINAL
1. Measure the resistance.
(Ohm-meter scale: Rx1 and Rx100)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
5-8
RESULTS
Approx.: 2.5 Ω
Approx.: 110 Ω
Less than: 0.4 Ω
Normal: ∞
Normal: ∞
Normal: Less than 1 Ω
Normal: ∞
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ms2548xr

Table of Contents