7.4.6 Parallel system shutdown (No Load supply)
NOTE !
The Load must be disconnected.
Initial status: Load supplied from all Inverters.
First operated unit
1. Press "total off" button on any one on the units.
• Load is disconnected from UPS.
• Rectifier and Inverter are shut down and all output and input contactors will be opened.
LED's, Rectifier, Inverter and Load are OFF.
•
First operated unit
2. Open Q1 (Pos. O) on all Units.
First operated unit
Modifications reserved
OPM_SGS_USM_50K_80K_0US_V030.doc
All other units of the system
All other units of the system
All other units of the system
Operating Manual SG Series 50 & 80 kVA
►
Continue
Page 72/82