9. Verify that the monitor, keyboard, and mouse cable (1A) connects Server 1 to the
Figure 6. Using the server cable-management arm and locating ports on the server
10. Verify that a power cable is connected to each server and to either a PDU, UPS,
11. Verify that two power cables are connected to the EXP300 and to either a PDU,
Figure 7. Locating EXP300 connectors
8
IBM® xSeries 340 HA Cluster: Installation Guide
console switch; then, verify that the monitor, keyboard, and mouse cable (2A)
connects Server 2 to the console switch.
Note: Verify that all cables on a server route through the cable-management arm
for that server.
Mouse
Power
connection
Keyboard
or properly wired and grounded electrical outlet.
Note: To provide redundant power protection against power failures for clusters
without a UPS, connect the servers to different PDUs, or to properly
grounded and wired electrical outlets on different circuits.
UPS, or properly wired and grounded electrical outlet.
Note: To provide redundant power protection against power failures for clusters
without a UPS, connect the servers to different PDUs, or to different prop-
erly grounded and wired electrical outlets on different circuits.
SCSI Bus
connector 2
PCI slot 1 - Ethernet
PCI slot 3 - SCSI RAID
Built-in Ethernet
Cable-management arm
Power
connector
Video
SCSI Bus
connector 1
Power
connector