hit counter script

Siemens SIMOTICS FD 1LQ1 Operating Instructions Manual page 6

Table of Contents

Advertisement

Table of contents
4.18
Transport................................................................................................................................35
4.18.1
Safety instructions for transport .............................................................................................35
4.18.2
Checking the delivery.............................................................................................................37
4.18.3
Securing the rotor...................................................................................................................37
4.18.4
Lifting and transporting the machine ......................................................................................39
4.19
Storage...................................................................................................................................39
4.19.1
Storing the machine ...............................................................................................................39
4.19.2
Storing the filter mats (option, air filter) ..................................................................................42
4.19.3
Protection against corrosion...................................................................................................42
4.20
Converter operation ...............................................................................................................43
4.20.1
Supply line configuration ........................................................................................................43
4.20.2
Converter input voltage ..........................................................................................................43
4.20.3
Reducing bearing currents .....................................................................................................44
4.20.4
Insulated bearings when operating the converter ..................................................................45
4.20.5
Converter operation on a grounded network..........................................................................47
5
Assembly ....................................................................................................................................................49
5.1
Safety instructions for mounting.............................................................................................49
5.2
Preparations for installation....................................................................................................50
5.2.1
Requirements for installation..................................................................................................50
5.2.2
Insulation resistance and polarization index ..........................................................................50
5.2.3
Testing the insulation resistance and polarization index........................................................51
5.2.4
Prepare the mating faces (IM B3) ..........................................................................................54
5.2.5
Prepare the mating face for a flange connection ...................................................................54
5.2.6
Prepare the mating face for wall mounting ............................................................................54
5.3
Lift the machine to where it will be installed, and position it...................................................54
5.3.1
Preconditions for correct alignment and secure attachment .................................................54
5.3.2
Checking the load handling attachments ...............................................................................55
5.3.3
Removing the rotor shipping brace ........................................................................................55
5.3.4
5.3.5
Removing anti-corrosion protection .......................................................................................56
5.3.6
Mounting the output elements................................................................................................56
5.3.7
Lifting and transportation........................................................................................................58
5.3.8
Putting the machine down......................................................................................................59
5.3.9
Draining condensation ...........................................................................................................60
5.3.10
Roughly aligning the machine ................................................................................................61
5.4
Installing the machine ............................................................................................................62
5.4.1
Preconditions for smooth, vibration-free operation ................................................................62
5.4.2
5.4.3
5.4.4
5.4.5
Axial and radial forces............................................................................................................65
6
Electrical connection...................................................................................................................................67
6.1
Safety instructions for the electrical connection .....................................................................67
6.2
Basic rules..............................................................................................................................67
6.3
Terminal box ..........................................................................................................................68
6.3.1
Terminal box 1XB1621...........................................................................................................69
6
SIMOTICS FD 1LQ1
Operating Instructions 01/2019

Advertisement

Table of Contents
loading

Table of Contents