Step 10 - Attach wall mat to grid panel clamps.
Eagle Foodservice Equipment, Eagle MHC, SpecFAB
Sandwich Prep Station
ASSEMBLY INSTRUCTIONS
wall
mat
grid
panel
clamp
Step 11 - Hang wire basket and snap plastic bin holder onto wall mat.
• 100 Industrial Boulevard, Clayton, Delaware 19938-8903 U.S.A. • www.eaglegrp.com
• Phone: 302/653-3000 • (Foodservice) 800/441-8440 • (MHC/Retail) 800/637-5100
• Fax: 302/653-2065
®
, and Retail Display are divisions of Eagle Group. ©2009 by the Eagle Group
plastic
bin
holder
Step 12: Level unit as necessary.
The leveling bolts allow approximately
1/2˝ adjustment.
post
leveling
foot
Assembly is complete.
wire
basket
(End)