hit counter script
Table of Contents

Advertisement

Quick Links

Power Systems
Installing the IBM Power System
S822L (8247-22L)
IBM
GI11-9908-06

Advertisement

Table of Contents
loading

Summary of Contents for IBM S822L

  • Page 1 Power Systems Installing the IBM Power System S822L (8247-22L) GI11-9908-06...
  • Page 3 Power Systems Installing the IBM Power System S822L (8247-22L) GI11-9908-06...
  • Page 4 Note Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on page 47, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. ™...
  • Page 5: Table Of Contents

    Safety notices ....... . . v Installing the IBM Power System S822L (8247-22L) ....1 Determining your server type Installing a rack-based server .
  • Page 6 Privacy policy considerations . 49 Trademarks . . 50 Electronic emission notices . . 50 Class A Notices . . 50 Class B Notices . . 54 Terms and conditions . . 57 Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 7: Safety Notices

    Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: v If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
  • Page 8 Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 9 v Each rack cabinet might have more than one power cord. – For AC powered racks, be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing. – For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the power to the system unit(s), or disconnect the customer’s DC power source, when directed to disconnect power during servicing.
  • Page 10 DANGER: Hazardous voltage, current, or energy levels are present inside any component that has this label attached. Do not open any cover or barrier that contains this label. (L001) (L002) viii Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 11 DANGER: Rack-mounted devices are not to be used as shelves or work spaces. (L002) (L003) Safety notices...
  • Page 12 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) (L008) Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 13 Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call. (C003)
  • Page 14 (C048) Power and cabling information for NEBS (Network Equipment-Building System) GR-1089-CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS (Network Equipment-Building System) GR-1089-CORE: Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 15 The equipment is suitable for installation in the following: v Network telecommunications facilities v Locations where the NEC (National Electrical Code) applies The intrabuilding ports of this equipment are suitable for connection to intrabuilding or unexposed wiring or cabling only. The intrabuilding ports of this equipment must not be metallically connected to the interfaces that connect to the OSP (outside plant) or its wiring.
  • Page 16 Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 17: Installing The Ibm Power System S822L (8247-22L)

    You might need to read the following documents before you install the server: v The latest version of this document is maintained online, see Installing the IBM Power System S822L (8247-22L) (http://www.ibm.com/support/knowledgecenter/POWER8/p8egj/p8egj_roadmap.htm). v To plan your server installation, see Planning for the system (http://www.ibm.com/support/ knowledgecenter/POWER8/p8had/p8had_8xx_kickoff.htm).
  • Page 18: Completing Inventory For Your Server

    If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
  • Page 19 8. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack. 9. Place a self-adhesive dot at the bottom EIA unit. 10. Mark the corresponding holes on the left side of the rack. Installing the IBM Power System S822L (8247-22L)
  • Page 20: Attaching The Mounting Hardware To The Rack

    Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: 1.
  • Page 21 EIA unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the middle pin. For details, see Figure 5. Figure 5. Pins that are seated on the front rail of the rack Installing the IBM Power System S822L (8247-22L)
  • Page 22: Installing The 8247-22L System Into The Rack

    (4) until the other nail heads slip into the other slots on the slide rails. Ensure that the front latch (5) slides over the nail heads. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 23: Installing The Cable-Management Arm

    Use the procedure to install the cable-management arm. To install the cable-management arm, complete the following steps: 1. Ensure that you have the following parts. Item Description Support arm Cable-management stop bracket Mounting bracket Cable-management arm Extension bracket Installing the IBM Power System S822L (8247-22L)
  • Page 24 Insert the tab into the hole (1) and turn the bracket (2) to secure it to the support arm. For details, see Figure 11 on page 9. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 25 Figure 12. Extending the pin, and installing the bracket into the slide rail 5. Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For details, see Figure 13 on page 10. Installing the IBM Power System S822L (8247-22L)
  • Page 26 Slide the other cable-management arm tab into the extension bracket (E) on the outside of the right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see Figure 15 on page 11 and Figure 16 on page 11. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 27: Cabling The Server And Setting Up A Console

    Your console, monitor, or interface choices are guided by whether you create logical partitions, which operating system you install in your primary partition, and whether you install a Virtual I/O Server (VIOS) in one of your logical partitions. Installing the IBM Power System S822L (8247-22L)
  • Page 28: Determining Which Console To Use

    This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see IBM PowerKVM. If you do not want to use PowerKVM, read the following section to learn more about choosing a console type.Go to the instructions for the applicable console, interface, or terminal in the following table.
  • Page 29: Cabling The Server To The Hmc

    Using service applications, the HMC can also communicate with managed systems to detect, consolidate, and forward information to IBM service for analysis. Installing the IBM Power System S822L (8247-22L)
  • Page 30 Autodetection. For information about how to set media speeds, see Setting the media speed (http://www.ibm.com/support/knowledgecenter/POWER8/p8hai/lanmediaspeed.htm). 3. If you are connecting a second HMC to your managed server, connect it to the Ethernet port that is labeled HMC2 on the managed server. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 31: Cabling The Server And Accessing The Ivm

    3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. ® 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
  • Page 32: Cabling The Server With Keyboard, Video, And Mouse

    2. For information about connecting enclosures and expansion units, see Enclosures and expansion units (http://www.ibm.com/support/knowledgecenter/POWER8/p8ham/p8ham_kickoff.htm). Completing the server setup Learn about the tasks you must complete to set up your managed system. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 33: Completing The Server Setup Without Using An Hmc

    ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM is an open virtualization solution that is offered for the Power scale-out family of Linux ™ servers built on POWER8 technology.
  • Page 34: Installing A Rack-Based Water-Cooled Server

    Install the VIOS operating system. For instructions, see Installing VIOS (http://www.ibm.com/ support/knowledgecenter/POWER8/p8hch/p8hch_installvios.htm). 5. If required, update the system firmware. v For instructions to get firmware fixes through the AIX or Linux operating system, see Getting server firmware fixes through AIX or Linux without a management console (http://www.ibm.com/ support/knowledgecenter/POWER8/p8ha5/fix_firm_no_hmc_aix.htm).
  • Page 35: Determining And Marking The Location In The Rack

    If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
  • Page 36 10. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack. 11. Place a self-adhesive dot at the bottom EIA unit. 12. Mark the corresponding holes on the left side of the rack. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 37: Attaching The Mounting Hardware To The Rack

    Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: 1.
  • Page 38 EIA unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the middle pin. For details, see Figure 22. Figure 22. Pins that are seated on the front rail of the rack Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 39: Installing The Cable-Management Arm

    Use the procedure to install the cable-management arm. To install the cable-management arm, complete the following steps: 1. Ensure that you have the following parts. Item Description Support arm Cable-management stop bracket Mounting bracket Cable-management arm Extension bracket Installing the IBM Power System S822L (8247-22L)
  • Page 40 Insert the tab into the hole (1) and turn the bracket (2) to secure it to the support arm. For details, see Figure 11 on page 9. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 41 Figure 27. Extending the pin, and installing the bracket into the slide rail 5. Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For details, see Figure 13 on page 10. Installing the IBM Power System S822L (8247-22L)
  • Page 42 Slide the other cable-management arm tab into the extension bracket (E) on the outside of the right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see Figure 15 on page 11 and Figure 16 on page 11. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 43: Installing The Water-Cooled 8247-21L System Into The Rack

    Installing the water-cooled 8247-21L system into the rack Use the procedure to install the water-cooled 8247-21L system into the rack. CAUTION: This system requires three people to install the system into the rack. Installing the IBM Power System S822L (8247-22L)
  • Page 44 3. Route the hoses that extend through the rear of the system through the cable-management arm. 4. Lift the blue release latches (1) on the slide rails and push the server (2) all the way into the rack until it clicks into place. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 45: Connecting The Supply And Return Hoses To The Manifold

    Figure 34. Installing the quick-connects to the supply and return hoses Note: Connect one hose to the inner circuit of the manifold and the other hose to the outer circuit of the manifold. Installing the IBM Power System S822L (8247-22L)
  • Page 46: Routing The Hoses From The System To The Manifold

    CDU. Note: The water that is used to cool the system must adhere to the water chemistry specifications. For more information, see Water cooling system specification and requirements (http://www.ibm.com/ support/knowledgecenter/POWER8/p8had/p8had_wc_overview.htm).
  • Page 47: Cabling The Server And Setting Up A Console

    This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see IBM PowerKVM. If you do not want to use PowerKVM, read the following section to learn more about choosing a console type.Go to the instructions for the applicable console, interface, or terminal in the following table.
  • Page 48 8. Press Enter until the server information appears. You have completed the setup for an ASCII terminal, and have started the ASMI. 9. Continue with “Completing the server setup without using an HMC” on page 17. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 49: Cabling The Server To The Hmc

    HMC network connections (http://www.ibm.com/support/knowledgecenter/POWER8/ p8hai/netconhmc.htm). Notes: v You can also have multiple systems that are attached to a switch that is then connected to the HMC. For instructions, see HMC network connections (http://www.ibm.com/support/ knowledgecenter/POWER8/p8hai/netconhmc.htm). Installing the IBM Power System S822L (8247-22L)
  • Page 50: Cabling The Server And Accessing The Ivm

    3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
  • Page 51: Cabling The Server With Keyboard, Video, And Mouse

    If your system has four power supplies, attach two power supplies to the 'A' feed and the other two the 'B' feed of the PDP. 3) Place the applicable circuit breakers in the ON position. Installing the IBM Power System S822L (8247-22L)
  • Page 52: Completing The Server Setup

    (http://www.ibm.com/support/knowledgecenter/POWER8/p8ham/p8ham_kickoff.htm). Completing the server setup Learn about the tasks you must complete to set up your managed system. ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM...
  • Page 53: Setting Up A Preinstalled Server

    You might need to read the following documents before you install the server: v The latest version of this document is maintained online, see Installing the IBM Power System S822 (8284)Installing the IBM Power System S822 (8284) (http://www.ibm.com/support/knowledgecenter/ POWER8/p8egh/p8egh_835_kickoff.htm).
  • Page 54: Completing Inventory For Your Preinstalled Server

    If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
  • Page 55 Connect the system power cords from the server and I/O drawers to the PDU with an IEC 320 type receptacle. c. Attach the PDU input power cord and plug it into the power source. Installing the IBM Power System S822L (8247-22L)
  • Page 56: Cabling The Server And Setting Up A Console

    This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see IBM PowerKVM. If you do not want to use PowerKVM, read the following section to learn more about choosing a console type.
  • Page 57: Cabling The Server To The Hmc

    2. In the work area, view and record the information that appears in the HMC Code Level section, including the HMC version, release, Service Pack, build level, and base versions. To cable the server to the HMC, complete the following steps: Installing the IBM Power System S822L (8247-22L)
  • Page 58: Cabling The Server And Accessing The Ivm

    1. Connect a serial cable from a PC or ASCII terminal to a system port on the server. For details, see “Cabling the server with an ASCII terminal” on page 40. Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 59: Cabling The Server With Keyboard, Video, And Mouse

    3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
  • Page 60: Routing Cables Through The Cable-Management Arm And Connecting Expansion Units

    3. Continue with “Completing the server setup.” Completing the server setup Learn about the tasks you must complete to set up your managed system. ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM...
  • Page 61 The power-on light on the control panel stops flashing and remains on, indicating that the system is powered on. For instructions, see Starting a system that is not managed by an HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8haj/startsysnohmc.htm). 3. Install an operating system and update the operating system.
  • Page 62 Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 63: Notices

    Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
  • Page 64: Accessibility Features For Ibm Power Systems Servers

    All IBM prices shown are IBM's suggested retail prices, are current and are subject to change without notice. Dealer prices may vary. This information is for planning purposes only. The information herein is subject to change before the products described become available.
  • Page 65: Privacy Policy Considerations

    This product uses standard navigation keys. Interface information The IBM Power Systems servers user interfaces do not have content that flashes 2 - 55 times per second. The IBM Power Systems servers web user interface relies on cascading style sheets to render content properly and to provide a usable experience.
  • Page 66: Trademarks

    IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the web at Copyright and trademark information at www.ibm.com/legal/copytrade.shtml.
  • Page 67 Warning: This is a Class A product. In a domestic environment, this product may cause radio interference, in which case the user may be required to take adequate measures. VCCI Statement - Japan The following is a summary of the VCCI Japanese statement in the box above: This is a Class A product based on the standard of the VCCI Council.
  • Page 68 Warning: This is a Class A product. In a domestic environment this product may cause radio interference in which case the user will be required to take adequate measures. IBM Taiwan Contact Information: Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 69 Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 70: Class B Notices

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by unauthorized changes or modifications to this equipment.
  • Page 71 European Community contact: IBM Deutschland GmbH Technical Regulations, Abteilung M456 IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 800 225 5426 email: halloibm@de.ibm.com VCCI Statement - Japan Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C 61000-3-2 product wattage compliance.
  • Page 72 Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 73: Terms And Conditions

    Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
  • Page 74 Power Systems: Installing the IBM Power System S822L (8247-22L)
  • Page 76 IBM® Part Number: 01LK526 Printed in USA GI11-9908-06...

This manual is also suitable for:

8247-22l

Table of Contents