Page 2
Cert. No. Q 05907 As a part of ABB, a world leader in process automation technology, we offer customers application expertise, service and support worldwide. EN 29001 (ISO 9001) We are committed to teamwork, high quality manufacturing, advanced technology and unrivalled service and support.
Pull handle to release (part no. C1900/0712) door... Check code number against the Specification Sheet – C – DIN Rail (part no. C1900/0713) SS/C1900R or SS/C1900RC Loosen captive screw Swing chart plate forward D – Optional Case-to-Panel Gasket ...and open door (part no.
...3 MECHANICAL INSTALLATION 3.2.1 Wall-/Pipe-Mounting – Fig. 3.4 3.2.2 Panel Mounting – Fig. 3.5 Dimensions in inches (mm) in – 28 UNF 4 holes 0.281 dia. studs into case or tap for in thread Mark four mounting holes Secure mounting 14.00 (355.6) brackets to case 12.72 (323.08)
4 ELECTRICAL INSTALLATION 4.1 Identifying the Input/Output Modules – Fig. 4.2 Warning. Before making any connections, ensure that the To gain access to the modules, open the door and chassis – power supply, any high voltage-operated control circuits see Fig. 2.2. There are six module positions as shown in and high common mode voltages are switched off.
...4 ELECTRICAL INSTALLATION 4.2.1 Selecting the Analog Input Type(s) – Figs. 4.3 and 4.4 Plug-in links are used to select the input type: PL1 & PL8 on the main p.c.b. (Fig. 4.3) Channel 1 PL1 & PL3 on the module (Fig. 4.4) Channels 2 to 4 TR10 mA V RTD &...
(nominal). This is due to internal voltage drops across a totalizer reset etc. Refer to the Programming Guide shunt resistor and measurement circuitry. IM/C1900–PGR or IM/C1900–PGC. 4.2.4 Thermocouple – Fig. 4.5 4.2.7 Analog Output – Fig. 4.5 Use correct compensating cable between the thermocouple 4.2.8 Relay Output –...
...4 ELECTRICAL INSTALLATION 4.2.9 Motorized Valve – Fig. 4.6 4.3 Module Connections A motorized valve with or without feedback requires 2 relays 4.3.1 Standard I/O or Analog + Relay (common and normally open terminals) to drive the valve in (Module Types 1, 2 and 7) – Fig. 4.5 either direction.
4 ELECTRICAL INSTALLATION 4.3.3 Eight Digital Inputs or Outputs 4.4 Power Supply Selection (Module Types 4 and 5 respectively) – and AC Connections – Fig. 4.10 Figs. 4.8 and 4.9 A plug-in link is used to select the board's function; digital inputs or digital outputs –...
Position 1 Position 2 Position 3 Module Type Module Type (Tick Box) Module Type (Tick Box) – – – Link Positions Link Positions Link Positions (Tick Boxes) (Tick Boxes) (Tick Boxes) 10 NO 10 NO 10 NO Not applicable on Module Type 2 Not applicable on Module Type 2 Position 4 Module Type (Tick Box)
Page 14
Position 5 Module Type (Tick Box) – Link Positions (Tick Boxes) 10 NO 10 NC 11 NO Link Positions (Tick Box) Type 4 Type 5 Not available on Module Type 2 Position 6 Module Type (Tick Box) – Link Positions (Tick Boxes) 10 NO Link Positions...
Page 15
Service and Repair Centre. – Food & Beverage – Manufacturing United Kingdom – Metals and Minerals – Oil, Gas & Petrochemical ABB Limited – Pulp and Paper Tel: +44 (0)1480 475321 Fax: +44 (0)1480 217948 Drives and Motors United States of America •...