hit counter script

System Maintenance - GE Voluson E8 Service Manual

Hide thumbs Also See for Voluson E8:
Table of Contents

Advertisement

GE H
RAFT
EALTHCARE
D
KTD102576, R
IRECTION
Section 10-5

System Maintenance

10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-3
Step
1
2
3
4
5
6
7
Image Archive
10-6
7
DRAFT (A
EVISION
System Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the EQC (Ultrasound Equipment Quality Check) form (see:
Paperwork
Record all probes and system options.
Turn the system power on and verify that all fans and peripherals turn on.
Power up
Watch the displays during power up to verify that no warning or error messages are displayed.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the LCD monitor and Touch Panel.
"Full Backup" all customer presets on Hard disk and/or DVD (see:
Presets
Configuration (Full Backup)" on page
Backup the Image Archive on DVD, USB-Stick, etc. (see:
page
4-42).
Section 10-5 - System Maintenance
23, 2012)
UGUST
Description
4-37).
V
E8 / V
OLUSON
OLUSON
S
ERVICE
page
10-25).
Section 4-5-3 "Save Full System
Section 4-5-6-1 "Save Image Archive" on
E6
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents

Save PDF