IBM Cloud Pak for Data system
Customer Install Guide
Chassis
3453-XXX
Version 1.6
Note
Before using this information and the product it supports, read the information in
"Safety notices" on page 5, "Notices" on page 36, the IBM Systems Safety Notices
manual, G229-9054, and the IBM Environmental Notices and User Guide, 03FP290.
© Copyright IBM Corporation 2019, 2020.
Customer Install Guide, 2U Chassis
1

Advertisement

Table of Contents
loading

Summary of Contents for IBM 3453 Series

  • Page 1 Note Before using this information and the product it supports, read the information in “Safety notices” on page 5, “Notices” on page 36, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, 03FP290. © Copyright IBM Corporation 2019, 2020.
  • Page 2 This edition applies to IBM Cloud Pak for Data System Components. Revised February 2020 © Copyright IBM Corporation 2019, 2020. US Government Users Restricted Rights – Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp. © Copyright IBM Corporation 2019, 2020.
  • Page 3: Table Of Contents

    Install the cable management arm ................28 Electronic Emissions Notices ..................31 Regulatory and Compliance ..................35 Notices .......................... 36 Copyright License:......................39 Trademarks ........................40 Readers’ Comments ...................... 41 © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 4: Safety

    Ennen kuin asennat tämän tuotteen, lue turvaohjeet kohdasta Safety Information. Avant d'installer ce produit, lisez les consignes de sécurité. Vor der Installation dieses Produkts die Sicherheitshinweise lesen. Prima di installare questo prodotto, leggere le Informazioni sulla Sicurezza. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 5: Safety Notices

    Read any additional safety information that comes with your system or optional device before you install the device. D005 DANGER: When working on or around the system, observe the following precautions: © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 6 Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
  • Page 7 (D005) C002 CAUTION: Only trained service personnel may replace this battery. The battery contains lithium. To avoid possible explosion, do not burn or charge the battery. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 8 Use of the controls or adjustments or performance of procedures other than those specified herein might result in hazardous radiation exposure. (C026) IBM® servers can use I/O cards or features that are fiber-optic based and that utilize lasers or LEDs. Laser compliance IBM servers may be installed inside or outside of an IT equipment rack.
  • Page 9 In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 10 (R001 part 1) R007 CAUTION: Use safe practices when lifting. L001 © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 11 In addition, do not lean on rack-mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). (L002) C010 © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 12 (L003) © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 13 (English translation: After providing the main product, if additional power cord is required, the cord is handled for repair/maintenance/mending purpose.) © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 14: Publications

    The chassis is can be installed in an IBM Cloud Pak rack or a customer supplied rack meeting the guidelines in the Customer Install Guide, Rack and System document included on the Safety and Regulatory CD shipped with your Cloud Pak for Data System components.
  • Page 15 Blocked cooling access will adversely affect the performance of your Cloud Pak for Data System and may void your warranty. Power can be supplied by the available IBM Cloud Pak for Data System PDUs and line cords or by customer supplied PDUs meeting the power requirements of the Cloud Pak for Data System components.
  • Page 16: Cloud Pak For Data System 2U Chassis Hardware Specifications

    [2] Power draw and heat load vary greatly by configuration and work load. When you plan for an electrical system, it is important to use the maximum values but actual power and cooling will be less. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 17: Operating Environment

    [3] Short term temperature only for servers with SSDs [4] Unit must acclimate to data center environment before unboxing to prevent condensation. [5] PDUs do not have fresh air cooling and can function in 60C (140F) environments © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 18: Rack Requirements

    Ensure that the rack in which you plan to install the system meets the space requirements outlined in the following figure: Figure 1: Top down view of installed chassis with 4-point horizontal mounting © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 19: Location In The Rack

    Location in the Rack The base IBM Cloud Pak for Data System consists of four main components (1G switch, 25G switch, two compute chassis) that are designed to be integrated in the same rack with PDUs. The recommended component placement is shown in Figure 2 below.
  • Page 20  Expansion chassis are marked “EXPANSION”.  The base system 25G switch is marked #3 and the base system 1G switch is marked #4. Expansion switches are marked “EXPANSION”. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 21 1U Blank Panel Labeled “expansion” Chassis 4 1U Blank Panel Labeled “expansion” Chassis 3 1U Blank Panel Labeled “2” Chassis 2 1U Blank Panel Chassis 1 Labeled “1” 1U Blank Panel © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 22: Package Contents

    The transceiver kit includes the following parts: – Sixteen transceivers Note: KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 23: Chassis Installation Procedure

    Read the Rack safety notices, Pub # G229-9054 included with the unit. C010 - This unit weighs approximately 121.2lb (55kg). IBM recommends the use of an appropriate lifting device to position the chassis on the rails. Rack rail parts inventory The enclosure comes with all of the hardware that is necessary for you to install the enclosure in the rack cabinet.
  • Page 24: Install Slide Rails Into The Rack

    Figure 5 4. Push the slide rail so that the pins and the latch go into the place. Note: The holes on the rack will either be square-shaped or round-shaped. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 25 6. Repeat steps 2 to 5 to install the other slide rail. Make sure that each slide rail is securely engaged in the flange by inspecting that the hook has caught and by sliding back and forward to ensure the slide does not pop out. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 26: Install The Enclosure On The Slide Rails

    Install the enclosure on the slide rails C010 - This unit weighs approximately 121.2lb (55kg). IBM recommends the use of an appropriate lifting device to position the chassis on the rails. Server nodes are preconfigured for their specific slots (1, 2, 3 & 4) in the chassis and they must not be removed from the chassis during the chassis installation process.
  • Page 27: Slide The Enclosure Into The Rack

    C010 - This unit weighs approximately 121.2lb (55kg). IBM recommends the use of an appropriate lifting device to position the chassis on the rails. Figure 9. Enclosure 5. Tilt and lower the enclosure; then, push the slides toward the enclosure and make sure the farthest nailheads go into the slots on the slides.
  • Page 28: Install The Cable Management Arm

    For these reasons and more, the cable management arms are required. Should you choose not to install the management arms, IBM will not be able to install or support your Cloud Pak for Data System. Should they be removed after installation, you will void your system warranty and onsite service will not be provided.
  • Page 29 3. After verifying the cable management arm is on the left side or reversing the cable management arm, align the inner mounting clip with the inner tab on the slide, then push it until it snaps into place. Figure 15. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 30 DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS. DO NOT POWER-ON THIS CHASSIS. POWER ON WILL BE DONE BY YOUR IBM INSTALLATION TEAM.
  • Page 31: Electronic Emissions Notices

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications to this equipment.
  • Page 32 Member States relating to electromagnetic compatibility. IBM cannot accept responsibility for any failure to satisfy the protection requirements resulting from a non- recommended modification of the product, including the fitting of non-IBM option cards. This product may cause interference if used in residential areas. Such use must be avoided unless the user takes special measures to reduce electromagnetic emissions to prevent interference to the reception of radio and television broadcasts.
  • Page 33 이 기기는 업무용 환경에서 사용할 목적으로 적합성평가를 받은 기기로서 가정용 환경에서 사용하는 경우 전파간섭의 우려가 있습니다. People's Republic of China Notice 声明: 此为 A 级产品,在生活环境 中, 该产品可能会造成无线电干扰 。 在这种情况下,可能需要用户对 其 干扰采取切实可行的措施。 Russia Notice © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 34 изделие относится к классу А. В жилых помещениях оно может создавать радиопомехи, для снижения которых нео Taiwan Notice 警告使用者 : 這是甲類的資訊產品,在 居住的環境中使用時,可 能會造成射頻干擾,在這 種情況下,使用者會被要 求採取某些適當的對策。 IBM Taiwan Contact Information: © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 35: Regulatory And Compliance

    Regulatory and Compliance © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 36: Notices

    Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
  • Page 37 Web sites. The materials at those Web sites are not part of the materials for this IBM product and use of those Web sites is at your own risk. IBM may use or distribute any of the information you supply in any way it believes appropriate without incurring any obligation to you.
  • Page 38 All of these names are fictitious and any similarity to the names and addresses used by an actual business enterprise is entirely coincidental. © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 39: Copyright License

    You may copy, modify, and distribute these sample programs in any form without payment to IBM, for the purposes of developing, using, marketing or distributing application programs conforming to the application programming interface for the operating platform for which the sample programs are written.
  • Page 40: Trademarks

    IBM, the IBM logo, ibm.com® and Netezza® are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S.
  • Page 41: Readers' Comments

    IBM business partner, or your authorized remarketer. When you send comments to IBM, you grant IBM a nonexclusive right to use or distribute your comments in any way it believes appropriate without incurring any obligation to you. IBM or any other organizations will only use the personal information that you supply to contact you about the issues that you state on this form.
  • Page 42 © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...
  • Page 43 Part Number: 03GJ005 Printed in Mexico © Copyright IBM Corporation 2019, 2020. Customer Install Guide, 2U Chassis...

This manual is also suitable for:

3455- series