hit counter script

Operation; Standard Operation; Adjustable Work Height - Eagle T10CF Operation Manual

Carton erector
Table of Contents

Advertisement

4. Operation

4.1 Standard Operation

Prior to operating the machine, please confirm that
1. The proper voltage is being supplied to the motor
2. All fasteners and protective covers are securely in place
3. All electronic components are dry
Machine Operation
1. Plug the machine into the power source
a. DO NOT hard wire the machine to the power source
2. Activate air supply
3. Place carton to be erected onto feeder pushing board
a. Operator must fold the front and rear bottom flaps while loading carton onto the feeder.
4. Press the green button or depress foot pedal to activate bottom flap folding mechanism and
carton feed.
TURN OFF MACHINE AND DISCONNECT IT FROM THE POWER
SOURCE PRIOR TO PERFORMING ANY MAINTENANCE OR SERVICE

4.2 Adjustable Work Height

Put the nut plate into the leg support according to the
figure.
Then loosely connect the fastening piece and the nut plate
with the socket head cap screws. Insert the leg between
the leg support and nut plate. The leg can now be adjusted
up and down as desired. Tighten the screws.
The working height should be set such that the operator is
able to comfortably reach the roller table while maintaining
approximately 4in (100mm) of distance from the machine.
- 7 -

Advertisement

Table of Contents
loading

Table of Contents