hit counter script

Installing Fiber-Optic Cables; Unlocking The Sfp Module Latch - Plastic Variety; Unlocking The Sfp Module Latch - Wire Variety - IBM DS4800 User, Installation And Maintenance Manual

Ibm system storage ds4800 storage subsystem
Table of Contents

Advertisement

Protective cap
Figure 27. Unlocking the SFP module latch - plastic variety
Protective cap
Figure 28. Unlocking the SFP module latch - wire variety
3. With the SFP latch in the unlocked position, extract the SFP module.
4. Replace the protective cap on the SFP module.
5. Place the SFP module into a static-protective package.
6. Replace the protective cap on the port.

Installing fiber-optic cables

To connect the fiber-optic cables, perform the following steps.
1. Remove the protective cap from the fiber-optic cable. See Figure 29 on page
Plastic tab
o
10
SFP module
v For SFP modules that contain wire tabs, unlock the SFP module latch by
pulling the wire latch outward 90°, as shown in Figure 28.
Wire tab
o
90
v For SFP modules that contain plastic tabs, slide the SFP module out of the
port.
v For SFP modules that contain wire tabs, grasp the wire latch and pull the
SFP module out of the port.
52.
SFP module
Chapter 3. Cabling the storage subsystem
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents