2 Engineering
2.3
Project integration
2.3.1
Import of application in PLC
The table below lists the steps for integrating the blocks of the LPallPatt library
folder "PLC" into your STEP 7 program.
The PLC implementation is equal for WinCC Advanced and WinCC Unified.
NOTE
Figure 2-6: Integrating the library blocks into TIA Portal
NOTE
Please follow the sequence of inserting the folders.
Table 2-38: Integrating the library blocks into STEP 7
No.
Copy the folder LPallPatt_Tags with Drag & Drop into the "PLC tags" in the PLC.
1.
Copy the folder LPallPatt_Types with Drag & Drop into the "PLC data types" in the PLC.
2.
Copy the folder LPallPatt_Blocks with Drag & Drop into the "Program blocks" in the PLC.
3.
4.
Now the blocks can be configured and called in the user program.
LPallPatt
Entry-ID: 109800960,
V3.1,
01/2024
Action
32