hit counter script
Download Print this page

GE Vivid S5 N Service Manual page 676

Hide thumbs Also See for Vivid S5 N:

Advertisement

P R E L I M I N A R Y
GE
P
N
FN091065, R
ART
UMBER
8-6-8
PSB (Probe Select Board) Board Replacement Procedure
c.) Push the ECG Connector all the way down through the rectangular hole in the PSB Board
6.) Unfold the cabinet cage assembly (by unfastening each of the two thumbscrews), as described in
8-6-1 "Opening and Removing the Cabinet Cage Assembly" on page 8-109
112). Turn the cage assembly into the position shown in
PIB-to-PSB
Flex Cable
8-150
2
EVISION
(see
Figure
8-184).
Figure 8-184 Pushing the ECG Connector Down
Figure 8-185 Cabinet Cage Assembly Open
Section 8-6 - Lower Section Components Replacement Procedures
VS5 N
VS6 N
AND
(cont'd)
(see
step 11
Figure 8-185
ECG Connector
S
M
ERVICE
ANUAL
on page 8-

Advertisement

loading

This manual is also suitable for:

Vivid s6 n
Save PDF